Unified production planning for an apparel SME

28% reduction in WIP holding cost within six months

Confidential — Apparel SMENovember 2025
Unified production planning for an apparel SME

Implemented iMake to unify BOM, procurement and shop-floor production planning.

The challenge

The client ran production planning across spreadsheets and a legacy desktop module. BOM revisions were slow, procurement lagged shop-floor demand, and WIP accumulated between cutting and finishing.

Our solution

We deployed iMake with integrated BOM management, MRP-driven procurement, and mobile shop-floor reporting. Master data was migrated in phased waves with parallel run for two production lines.

Results

WIP holding cost fell 28% within six months. Planning cycle time dropped from three days to same-day refresh. Material shortages on priority styles reduced by 41%.

Technology stack

  • iMake
  • Node.js
  • MongoDB
  • React

Let’s build

Connect with our team to elevate your digital journey.

Tell us about your goals — we’ll come back within one business day with a point of view, not a proposal template.